Preconstruction scope and bid review

Get your team on the same scope.

See what each trade covers, what bidders still need to confirm, and what leadership needs to decide. Keep the evidence with the people doing the review.

Watch the demo
GaplineReview overview
Trade review
Example trade review

Electrical, with clarity.

Awaiting approval
Scope language

Trade responsibilities drafted for review

Draft
Temporary power

Confirm inclusions with the bidder

Open
Decision brief

Recommendation, reason, and next action

Read brief
One connected review

Know what’s covered before award.

Give bidders, project managers, and leadership the detail each needs to move the same decision forward.

Draft scopes by trade

Give each bidder a clear starting point based on the project documents, with responsibilities broken out by trade.

Compare what each bid actually covers

Level bids trade by trade: see who carries each item, where the proposals differ, and what still needs a bidder’s answer.

Give leadership the short read

Put the best fit, why it stands out, and the gap to resolve up front instead of asking leaders to read the full PM report.

Keep the evidence with the PM

Keep scope clauses, open questions, and drawing or proposal references close when someone needs to see why the brief says what it says.

Make approval a team decision

Ask a shared question once when it affects multiple trades, and keep trade-specific questions separate. Your team reviews the answers and makes the final call.

01 · Scope drafting

Draft scopes by trade

Start with the drawings for this job, not a scope letter left over from the last one.

Illustrative exampleRetail fit-out · Electrical
Electrical draft · E2.1
  • Install branch wiring for new display receptacles.
  • Label the circuits at panel LP-1.
Open: who restores the wall finish?
Traditional method
Copy a prior scope letter, then work through new drawings and specs to see which clauses still belong.
With Gapline
Review trade-specific draft language alongside its drawing reference. Keep the unresolved wall repair separate so it does not look like assigned work.
What you gain and how to track it
Compare minutes from opening the bid set to a draft ready for PM review. Use similar trade packages and count review time in both runs.
02 · Bid leveling preview

Compare what each bid actually covers

A lower number doesn’t tell you which work is included. This preview shows what a side-by-side scope review could surface before award.

Illustrative exampleOffice renovation · Electrical proposals
Fictional proposal coverage comparison
Scope itemBid ABid B
Branch wiringIncludedIncluded
Temporary powerExcludedNot stated

Follow-up: Ask Bid B to confirm temporary power in writing. No bidder has confirmed coverage yet.

Traditional method
Read proposals side by side and manually reconcile differently worded inclusions and exclusions.
With Gapline
The bid-leveling preview groups proposals against a common list. An explicit exclusion and silence remain different signals, and neither counts as covered.
What you gain and how to track it
Track gaps identified and resolved before recommendation, plus the number still open at decision time.
03 · Leadership brief

Give leadership the short read

Put the recommendation, the reason, and the condition that could change the decision in one place.

Illustrative exampleFictional recommendation · HVAC upgrade
Recommended for follow-upBid B

Its proposal includes controls startup and testing.

Decision condition

Confirm that the proposed unit lead time fits the shutdown window before award.

Waiting on lead time
Traditional method
Forward a long PM report and spend the meeting digging for the assumption that matters.
With Gapline
Give leaders a concise recommendation with the material open issue up front. Keep the detailed PM review available when a decision needs more context.
What you gain and how to track it
Track elapsed time from a brief ready for review to a decision. Note decisions sent back for missing information, not just fast answers.
04 · Source traceability

Keep the evidence with the PM

A good question points the reviewer to the source, not just to another conversation.

Illustrative exampleFictional plumbing coordination · Two sources
Sheet P2.1

Calls for a floor drain at the sink alcove.

Proposal §3

Excludes coring through the slab.

PM clarification

Who carries the slab opening for the drain?

Ownership unresolved
Traditional method
Reopen drawing sheets, proposal PDFs and meeting notes just to reconstruct why an item was flagged.
With Gapline
Keep the clause, the question and the supporting references together. The PM can verify both sources, correct the draft and assign the follow-up.
What you gain and how to track it
Ask reviewers to locate the original evidence for a sample of flagged items. Record lookup time and references that need correction.
05 · Team review

Make approval a team decision

Ask once when several trades touch the same work. Keep separate trade questions separate, and let your team decide what to include.

Illustrative exampleFictional roof penetration · Three trades
1Ask once

Who owns roof curb flashing?

2Route to trades

Roofing, mechanical and structural see the shared question.

3PM decides

Record the reviewed owner before adding anything to approved scope.

Keep separate: A mechanical-only duct clearance question stays with mechanical.

Traditional method
Send several overlapping email questions, then reconcile conflicting replies before deciding who owns a handoff.
With Gapline
Bring answers together for PM review. Track the shared issue once without merging unrelated questions or treating a note as approval.
What you gain and how to track it
Track duplicate requests and count open shared items that have a named owner before sign-off.
How a review comes together

From a drawing to a decision.

Turn drawings into trade scopes before bids arrive. Compare what bidders actually cover and what needs an answer before award. Then track unresolved scope and revisions from finalists through closeout.

Walk through the Electrical example
  1. Phase 1

    Drawings & Trade Scope

    Output: A draft scope for each trade and a list of questions for the project manager.

  2. Phase 2

    Bid Leveling

    Output: A side-by-side bid comparison and a short recommendation with the gaps to resolve.

  3. Phase 3

    Gap Analysis

    Output: A record of what changed, what’s covered, and who needs to act from finalist through contract award.

Leadership view

The decision.
The reason.
The next step.

PM view

Go deeper when
it matters.

Scope clauses
Open questions
Supporting references

Different roles. Shared context.

The right detail.
For the right person.

Leadership gets the recommendation, why it matters, and what to do next. Project managers keep the detailed scope, open questions, and references behind it. Your team owns the final approval.

See an example brief