Better questions for real project work.
Start with a question you’d ask a teammate. Open a card to see when it helps, how to ask a stronger question, and why that extra detail matters.
A simple way to ask
- Name the job. Which project, trade, or decision?
- Point to the source. Which drawing, proposal, or revision?
- Say what you need back. A comparison, a short brief, or a list of questions? Ask the assistant to flag what it can’t verify.
In Gapline, a starter is enough to begin. The assistant is designed to add review context behind the scenes. These cards are just practice: nothing is submitted or answered here.
See the Assistant previewDrawings & trade scope
Who carries temporary power?
When to use it
Before issuing the scope, when two trades might assume the other has it.
Try a more specific prompt
Using Harbor House Electrical Revision 1, identify who furnishes, installs, maintains, and removes temporary power distribution. Treat utility charges as a separate responsibility. Cite the scope clause for each assignment and mark anything the documents don’t confirm as unassigned.
Why this works
Providing equipment and paying the utility bill aren’t the same thing. Asking for each responsibility separately makes the missing handoffs visible instead of rolling them into one vague answer.
What does the electrical scope include?
When to use it
When you need a short list of responsibilities a bidder can review.
Try a more specific prompt
Summarize the Harbor House electrical scope in Revision 1 for a subcontractor preparing a bid. Group the work into installation, coordination with other trades, and submittals or closeout. Cite the clause for each group and list unresolved items, like temporary power, separately from confirmed work.
Why this works
Naming the reader and grouping the work gives the bidder a checklist they can price. Keeping open questions separate makes it harder to mistake an unresolved item for an assigned responsibility.
Where do two trades overlap?
When to use it
When two scopes mention the same system but may not cover the same work.
Try a more specific prompt
Compare the issued Electrical and HVAC scopes for equipment power. Make a short table showing who supplies the equipment, who installs it, and who makes the final connection. Cite both scopes and flag any handoff that’s duplicated or unassigned.
Why this works
A handoff rarely fits neatly under one trade. Separating the three jobs exposes both double coverage and work that neither trade is carrying.
What should I ask before I issue this scope?
When to use it
When a draft looks ready but has unanswered questions.
Try a more specific prompt
Review the draft Plumbing scope against the latest issued drawings before it goes out to bid. Pick the three open questions most likely to affect price or ownership and phrase each so a bidder can answer it directly. Include the drawing sheet and note what the answer would settle.
Why this works
A ranked shortlist keeps the review focused on decisions that matter. A drawing reference and a specific question give the bidder somewhere to start.
What’s shown but not assigned?
When to use it
When a drawing shows an item and no trade seems to own it.
Try a more specific prompt
Look for roof penetrations on the latest Mechanical drawings and compare them with the Roofing and Mechanical scopes. For each penetration, check who cuts the opening, flashes it, and patches adjacent work. Cite the relevant sheet or scope clause and mark any owner the documents don’t name.
Why this works
A drawing can show that work is needed without saying who does it. Checking the drawing against both scopes keeps an illustration from being mistaken for an assignment.
Bid leveling
What’s missing from the electrical bids?
When to use it
When comparing proposals against the same issued scope.
Try a more specific prompt
Compare Electrical Bids A and B against the same issued scope, Revision 1. Make one row per item and label it included, explicitly excluded, or not stated in each bid. Cite the proposal page and put any item with no evidence on the follow-up list.
Why this works
Silence isn’t the same as an exclusion or a promise. Comparing both bids against one revision helps you ask the right follow-up without overstating a bidder’s coverage.
How do these two bids differ?
When to use it
When two proposals look similar until you read the fine print.
Try a more specific prompt
Compare the two HVAC bids against the same issued scope and drawing revision. Show only material differences in inclusions, exclusions, allowances, and qualifications, with a page reference for each. End with the two questions that would make the biggest difference to an apples-to-apples comparison.
Why this works
Naming a common baseline keeps you from comparing two different versions of the job. Asking for differences only gives you a review list instead of two more bid summaries.
Is the lower bid actually cheaper?
When to use it
When the base prices differ but the proposals don’t carry the same work.
Try a more specific prompt
Show the base price of each bid and use only documented, priced alternates to bring them onto a comparable scope. Show the math for each adjusted total and list any unpriced scope gaps separately. If a material gap is still unpriced, say what needs a quote before calling either bid cheaper.
Why this works
The lowest base price can leave out work you’ll pay for later. Separating priced adjustments from unknowns shows what you can compare today and what you still need to ask.
Which allowances need a closer look?
When to use it
When a bid carries placeholders instead of firm prices.
Try a more specific prompt
List every allowance in Bid A with its amount, page reference, and the work or quantity it covers. Note any stated exclusions and flag vague descriptions as needing clarification. Show which allowances would prevent a fair comparison with Bid B.
Why this works
Two bidders can use the same allowance label for different work. Asking what each amount buys tells you which numbers you can actually compare.
Draft a follow-up for the electrician.
When to use it
When you need a draft that makes it easy for the bidder to answer in writing.
Try a more specific prompt
Draft a short email to the electrical bidder about temporary power for Harbor House. Ask them to confirm furnishing, installing, maintaining, and removing distribution, and ask who pays for utility usage as a separate question. Have them cite the proposal revision, note any exclusions, and leave the email as a draft for review.
Why this works
Separate questions are harder to answer with a vague yes. Asking for the revision gives the project manager a written reply they can tie back to the bid.
Revisions & gap analysis
What changed since the last revision?
When to use it
When a new drawing or proposal comes in and you need the practical differences.
Try a more specific prompt
Compare Electrical Revision 2 against Revision 1 and focus on changes that affect the trade’s work. Group additions, removals, and changed requirements, with a reference to both versions where available. Flag changes that might affect cost or responsibility, and don’t estimate a price.
Why this works
Naming both revisions anchors the comparison. Grouping the differences helps the team see what disappeared as well as what was added, without mistaking a flagged cost risk for a quote.
Did this clarification close the gap?
When to use it
When you have a reply but aren’t sure it settles the whole question.
Try a more specific prompt
Read the latest written temporary-power reply against the original clarification. List which parts it answers, who it assigns them to, and any parts that remain open. Quote or cite the wording that supports the status and say what still needs a written answer.
Why this works
A reply can settle installation without settling power charges. Checking each part of the original question prevents a partial answer from closing the whole item.
Is this extra work or already included?
When to use it
When a change proposal may duplicate the awarded scope.
Try a more specific prompt
Compare the proposed extra panel with the signed electrical scope, its referenced drawings, and accepted clarifications. Separate work already included at award, work first shown after award, and anything the records don’t resolve. Cite both sides and leave the change decision to the project team.
Why this works
Using the signed scope as the starting point prevents a later drawing from rewriting what was awarded. The team can then review the disputed work without reopening everything already agreed.
Which open items could delay award?
When to use it
When a long issue list makes it hard to choose what to chase first.
Try a more specific prompt
Review the open Electrical items before award and select only those that could change price, ownership, or the award date. For each, explain what decision is blocked and who should answer if the record names someone. Include a documented due date or say that no date is set.
Why this works
Tying each question to a consequence tells the team which calls to make first. Keeping unknown owners and deadlines visible is more useful than filling in guesses.
What’s still open before closeout?
When to use it
When you need to distinguish finished work from missing closeout paperwork.
Try a more specific prompt
Use the closeout checklist to compare required submittals, warranties, and as-builts with what the team has received. Put each item under received, needs correction, or missing. Include the documented owner and source, and flag anything you can’t verify.
Why this works
Received doesn’t always mean accepted or complete. Distinguishing corrections from missing documents shows exactly what needs to happen before closeout.
Briefs & team handoffs
What should leadership know before award?
When to use it
When leaders need a decision, not the full review file.
Try a more specific prompt
Write three bullets for leadership using the electrical bid comparison and open-issues list. Give the strongest documented option, the reason it stands out, and the unresolved item that could change the recommendation. Cite the evidence and state what decision the team needs to make.
Why this works
The three bullets fit a quick decision conversation. Naming the condition that could change the recommendation helps leadership see where it’s still too early to commit.
Turn this into a one-minute briefing.
When to use it
When you’re about to walk into a meeting and need the essentials.
Try a more specific prompt
Turn the electrical review into a one-minute briefing for the owner, using no more than 100 words. Lead with the decision needed and the evidence behind it. End with the biggest unresolved risk and the next action rather than recapping every trade item.
Why this works
Naming the audience, length, and order tells the assistant what to leave out. The owner can act on the brief without reading the full review first.
What should I put on the meeting agenda?
When to use it
When you need a short list of decisions that won’t get buried in status updates.
Try a more specific prompt
Turn the open scope questions into a 15-minute meeting agenda. Combine questions that affect multiple trades, but keep trade-specific issues separate. For each item, list the decision needed, the document to have ready, and who should be in the room if known.
Why this works
A decision-oriented agenda gives participants a reason to bring the right documents. Grouping shared issues avoids making the same decision in several separate discussions.
Where did that conclusion come from?
When to use it
When an answer sounds right but you need to verify it.
Try a more specific prompt
Check each claim in this scope recommendation against the drawings, proposals, and written clarifications. For supported claims, give the sheet number, proposal page, or clarification date. Label anything inferred, conflicting, or unsupported so I know what to verify.
Why this works
A citation is useful only if it supports the specific claim. Separating facts from assumptions lets the reviewer check the risky parts quickly.
What should I do next?
When to use it
When you have findings but need to turn them into actions.
Try a more specific prompt
Turn the open Electrical issues into an action list for the next project meeting. For each item, give the next step, owner, and due date where the record supports them. Mark unassigned owners or dates as needing confirmation, and put award blockers first.
Why this works
An action list is only useful if people know who does what. Making unknowns explicit prevents the team from treating suggested owners or dates as commitments.